VIPER REXUS

Saturday, 10.03.2018

That was a very motivating day. After all experiments were prepared for Bench Test, we had two full flight simulation test on the Bench. Everything worked fine. At the first Bench Test, the camera signal shown on a small monitor was quite bad, so Michael went to the telemetry station of MORABA at the second Bench Test. There, the video signal was perfect and the staff there promised us, that this was the video quality they would provide during the flight. After those tests, all experiments were prepared for flight, and the rocket payload was assembled. After passing another Com-Check, the rocket was loaded onto the trailer and transported to the church for final launch preparation. It was such a nice feeling to see the whole payload standing upright in the middle of Dome!

Video of day 6: